Skip to main content
District

Carlsbad High

Carlsbad High Phase I

Carlsbad High School was originally constructed in 1958 and it received significant improvements to Buildings 4000-9000 from the Measure P General Obligation Bond. When Measure HH was passed upgrading Building 2000 into a 21st Century science lab was the next project on the list. The existing 21,000 square foot, with 15 classrooms, a computer lab, and a teacher’s office was converted to 11 larger science classrooms, a flex classroom, and support spaces, upgraded with the new technology, utility infrastructure, lighting, casework, and finishes to be in alignment with the curriculum standards of today. 

Public Presentations: 

CHS 11.15.2018

CHS 2.5.2019 Part 1

CHS 2.5.2019 Part 2

CHS 2.20.2019

CHS 4.23.2019 Part 1

CHS 4.23.2019 Part 2

CHS 5.6.2019 Part 1

CHS 5.6.2019 Part 2

CHS 5.15.2019 
Final Design Approval

CAC 8.21.2019 Phase 3 Proposal

CHS 8.21.2019 Modernization Update

CHS 2.19.2020 Construction Phasing Plan

CHS 3.11.2020 Final Guaranteed Maximum Price Presentation